Start with the layout
Identify the line or drawing where the right-angle change occurs.
A 90° elbow turns the pipe route through a right angle. Bring the angle, radius and connection details together in one clear enquiry.
The radius and centre-to-end dimensions affect the space occupied by an elbow. Use the approved layout to identify the geometry, rather than substituting one radius for another.
Identify the line or drawing where the right-angle change occurs.
Long-radius and short-radius configurations should not be treated as dimensionally interchangeable.
Include end size, wall thickness and the applicable weld-end requirements.
Separate drawing-specific dimensions from the standard configuration.
These fields describe the requirement. Numerical dimensions must come from the specified standard or approved drawing.
| Requirement | Include in your enquiry |
|---|---|
| Direction change | 90°. |
| Radius configuration | Required designation and applicable reference dimensions. |
| Centre-to-end | Specified standard values or approved drawing requirements. |
| End sizes | Nominal connection sizes and wall thicknesses. |
| Material | Complete fitting specification and grade. |
| Documentation | Drawing revision, inspection and certificate requirements. |
Availability and suitability require review of the exact configuration.
Find the family, then record the full product specification and grade.
Explore guide →Keep the standard, edition and drawing dimensions together.
Explore guide →Bring quantities, documents and project details into a clear draft.
Explore guide →Not without project review. The geometry and its effect on the system need to be assessed by the responsible engineer.
Not by itself. The radius, size and applicable standard also matter.
Use the approved specification. Include the governing dimensional reference when using a schedule designation, and identify any special thickness.
No. The illustrations explain geometry only and are not manufacturing drawings.
Prepare the end sizes, material, quantity and project requirements for review.
Prepare your enquiry →