Keep the grade distinction clear
S32750 and S32760 should be named individually in the enquiry. A broad family description is not an instruction to substitute grades.
Explore super duplex fitting enquiries using the exact UNS grade and project specification. Material identification, processing and inspection requirements belong in the same scope.
The grade references below help structure an enquiry. They are not a statement of stock, equivalence or suitability for a particular service.
| Grade / detail | What to specify |
|---|---|
| UNS S32750 | Include the full fitting specification and requested grade. |
| UNS S32760 | State this grade explicitly rather than requesting “super duplex” alone. |
| Inspection requirements | Identify project-specific tests and acceptance criteria before quotation. |
Reference note: Outokumpu duplex and super duplex guide. Use the project’s approved specification for selection.
Keep material identity and acceptance criteria together.
S32750 and S32760 should be named individually in the enquiry. A broad family description is not an instruction to substitute grades.
Define marking and certificate requirements so the delivered fitting and its material documentation can be identified together.
Material availability is confirmed against the selected fitting, dimensions and project requirements.
Direction changes and radius configurations.
Explore fitting →Equal and reducing branch connections.
Explore fitting →Concentric and eccentric diameter changes.
Explore fitting →Welded closures for pipe ends.
Explore fitting →Neck and lap details for flange connections.
Explore fitting →Drawing-specific geometries and requirements.
Explore fitting →Include the information needed to review your super duplex requirement.
Exact grade, product specification, edition and any approved alternatives.
Product type, sizes, wall thicknesses and applicable dimensional standard.
Relevant service information and the approved material specification.
Manufacturing condition, tests, certificates and marking requirements.
Item quantities, required date and delivery location.
Drawing numbers, revisions and any project-specific notes.
List only the alternatives approved by your project specification. Grade changes need technical review and should be agreed before supply.
No. Availability and delivery depend on the exact fitting, grade, dimensions, quantity and documentation requirements. These must be confirmed in the quotation.
Send the required fitting type, end sizes and wall thicknesses. Availability is reviewed for that combination; a material family does not define a universal size range.
Specify the certificate type, material traceability, inspection and testing required by the project. Include supplementary requirements with the initial enquiry.
Prepare the exact grade, fitting dimensions and project specification for review.
Prepare your enquiry →